Selling what the building does not use
Net metering lets a plant export surplus electricity to the grid. UNAJ handles the approvals and paperwork. The aim is a lower bill, and for sites that export regularly, income from the surplus.
Bank finance and subsidy assistance sit beside that paperwork. The team helps with loans from banks and with government subsidy applications. The published promise is no hidden charges.
After the plant is on
Annual maintenance covers check-ups, cleaning, and performance so the system keeps generating. Support is available for technical issues. Panel warranties on the published packages run 30 years.
A site-survey quote is confirmed after the roof visit. Call +91-9015023484 or +91-8178917718, Monday to Saturday, 9:30 AM – 6:30 PM, or send the bill through the quote form.

